| Tgl | Ket | Masuk | Keluar |
| 7 September 2024 | Bayar Material Bu Uum | Rp 14.052.500 | |
| 7 September 2024 | Infaq an **d* * | Rp 15.000.000 | |
| 2 September 2024 | Biaya Cor : Kosim dkk (13 orang) | Rp 3.700.000 | |
| 2 September 2024 | Biaya Cor M Ijong | Rp 1.200.000 | |
| 1 September 2024 | Konsumsi : biaya cor | Rp 200.000 | |
| 30 Agustus 2024 | Infaq kencleng | Rp 1.040.000 | |
| 31 Agustus 2024 | Pembayaran Pegawai : Kosim, Indra | Rp 1.430.000 | |
| 31 Agustus 2024 | Pembayaran Pegawai : M Ijong | Rp 4.200.000 |
| Luas Area | sekitar 40.000 m2 |
| Status Lokasi | Wakaf |